Basement finishing, legalization & renovations across Toronto & GTACall (905) 917-4568 · Mon–Sat, 8am–6pm
Toronto & GTA basement contractor

Finish your basement. Make it legal. Earn rent.

Basement finishing and legal basement apartments, plus legalization of the basement unit you already have. Built warm, dry and to code across Vaughan, Brampton, Bradford, Bolton, King and the GTA. One team from permit to final inspection, with a written fixed-price quote.

Permits handledFixed-price quotesExperienced, licensed prosFinancing available

Get your price

Enter your basement size and see a ballpark price right away. We'll confirm the exact price and call you back.

Add to my basement
Typical starting prices

Know the numbers before we visit

Basement finish, 500–800 sq ft, basic washroom includedabout $80 / sq ft
Larger basements (800+ sq ft)$70–75 / sq ft
Kitchenadd ~$10,000
Extra 3-piece washroomadd $8,000–10,000
Walk-in shower, mosaic tile & glass dooradd ~$3,000
Separate entrancefrom $18,000
Legalize an existing unitfrom $25,000
New legal basement apartmentfrom $70,000
Before HST. Building permit not included (about $5,000 on average). Final price confirmed after a free in-home assessment.
What we build

Three ways to use your basement

Most GTA basements are the cheapest square footage you'll ever add to your home.

Basement finishing

From $70 / sq ft, washroom included

  • Rec rooms, media rooms, gyms and offices
  • Extra bedrooms for a growing family
  • Insulated, dry and built to code
Basement finishing

Legal basement apartments

Starting from $70,000

  • New second units or legalizing an existing one
  • Fire separation, egress, separate entrance
  • Drawings, permits and inspections handled
Basement apartments

Basement bathrooms

Starting from $9,000

  • New 3-piece washrooms with rough-in
  • Walk-in showers and waterproofed tile
  • Wet bars and laundry rooms
Basement bathrooms
Already have a basement unit?

We legalize existing basement apartments

Many GTA homes, especially in Brampton, already have a basement unit that was never permitted. An unregistered unit can void your insurance, cause problems when you sell, and leave you liable if something goes wrong. We bring it up to code and through inspection so you can rent it with confidence.

  • Site visit to see what already passes and what doesn't
  • Drawings and building permit
  • Fire separation, smoke and CO alarms, egress windows, entrance
  • Electrical and fire inspections, and help with city registration where required
How it works

From bare concrete to move-in ready

Free estimate

Use the online estimator or call us for a ballpark in minutes.

Site visit

We measure, check for moisture, ceiling height, plumbing and electrical, and talk through layouts.

Fixed-price quote

A written, itemized quote, schedule and financing options. No surprise extras.

Build & inspect

Permits, trades, inspections and clean-up handled, with a written warranty.

Why a basement specialist

Basements fail in ways upstairs rooms don't.

  • Moisture first. We check for water and fix the cause before we insulate or close a wall.
  • Experienced, licensed professionals. Every job is done by experienced, licensed trades, with permits pulled and inspections passed.
  • Ready for rent later. Ask and we'll plan egress, fire separation and a side entrance so a legal unit is possible down the road.
  • One team, start to finish. The same people from first visit to final inspection.
About us
Will my basement qualify?

Minimum requirements for a legal basement unit

Check these before you spend money on drawings. If your basement falls short, it can usually be fixed, and we price that upfront.

Ceiling height: about 6'5" (77 in)

The Ontario Building Code asks for at least 1.95 m (about 77 inches) of clear ceiling height over the required living areas of a basement unit in an existing house.

Under bulkheads & beams: about 6'1" (72–73 in)

Ducts, beams and bulkheads can drop lower, but not below about 1.85 m (roughly 72 to 73 inches). Lower than that and the ceiling has to be raised: ducts moved, or the floor lowered or underpinned.

Egress window in every bedroom

An openable window with at least 0.35 m² (about 3.8 sq ft) of clear opening and no side narrower than 380 mm (15 in). More on egress windows.

A safe way out

A separate entrance, or a shared exit protected with fire separation.

Fire separation & alarms

Fire-rated drywall and sealing between the units, plus interconnected smoke and carbon monoxide alarms.

Mechanical room: isolated & sprinklered

The furnace and water heater room has to be closed off with fire separation, and a sprinkler head is typically needed in that room. Budget for it from day one.

Building permit: about $5,000

Permit fees and drawings are not included in our per-square-foot prices. On average they come to about $5,000, depending on the city and the project.

Permit & inspections

Building permit, then building, electrical (ESA) and fire inspections. Some cities also require the unit to be registered.

Do it right once: no fines, no failed inspections, no headaches. We take care of all of it for you.

Plain-language summary of the main rules. Your city's inspector has the final word, and we check your house against the current code during the free review.

Service areas

Basements in Vaughan, Brampton, Bradford, Bolton, King and across the GTA

All locations →

Questions

Common questions

How much does it cost to finish a basement in Toronto?

For a basement of about 500 to 800 sq ft, plan on about $80 per square foot before HST, including a basic washroom. Larger basements cost less per foot ($75 up to about 1,200 sq ft, $70 above that) and smaller ones a little more. So an 800 sq ft basement is about $64,000. A kitchen adds about $10,000, an extra 3-piece washroom $8,000 to $10,000, and a walk-in shower with mosaic tile and a custom glass door about $3,000. The building permit is extra, about $5,000 on average. Our online estimator and the form at the top of this page give you a ballpark right away.

How long does it take to finish a basement?

A typical 700 to 1,000 sq ft basement takes 5 to 9 weeks, depending on permits, whether a bathroom is added, and inspection timing. Legal basement apartments usually take 3 to 5 months including design and permits.

Do I need a permit to finish my basement?

In Toronto and most GTA cities, finishing a basement usually needs a building permit, especially when adding a bathroom, bedroom or moving walls. We tell you upfront and handle the application.

Can I rent out my basement?

Only if it's built as a legal second unit, with fire separation, proper egress windows, ceiling height and usually a separate entrance. We can build a new legal unit or bring an existing one up to code.

Are your prices fixed?

Yes. After the site visit you get a written, itemized fixed price. It only changes if you ask for changes or we uncover hidden damage, which we show you before doing any extra work.

Ready to price your project?

Free in-home assessment and a written, fixed-price quote. No pressure.