Basement finishing, legalization & renovations across Toronto & GTACall (905) 917-4568 · Mon–Sat, 8am–6pm
Home / Bathrooms

Bathroom renovations & basement bathrooms

From a brand-new basement washroom to a full ensuite rebuild upstairs, we handle demolition, plumbing, waterproofing, tile and finishing, with a fixed price agreed upfront.

What's included

A complete remodel, start to finish

  • Protection of floors and furniture, demolition and disposal
  • Plumbing rough-in and fixtures by licensed plumbers
  • Electrical, lighting and exhaust fan to code
  • Full waterproofing membrane behind all wet-area tile
  • Tile floors and walls, vanity, toilet, tub or shower
  • Paint, trim, accessories, final clean
Pricing

Typical washroom prices

Most GTA projects fall within these ranges. Your exact price depends on size, layout changes and the finishes you choose.

ProjectWhat it usually coversTypical range
Powder room
2-piece
New vanity, toilet, flooring, lighting, paint$9,000 – $20,000
Full bathroom
3 or 4-piece, ~40 sq ft
Full gut, new tub or shower, tile, vanity, fixtures$18,000 – $38,000
Ensuite / large bath
60–100 sq ft
Walk-in glass shower, freestanding tub, double vanity$26,000 – $55,000+
Tub-to-shower conversionRemove tub, build tiled walk-in shower with glassadd ~$3,500 – $6,000

Prices in CAD before HST. Every project gets a free in-home assessment and a written fixed-price quote.

Popular upgrades

Options homeowners love

Curbless walk-in showers

Sleek, accessible and easy to clean, with linear drains and frameless glass.

Heated floors

Electric in-floor heat under tile for warm floors through Toronto winters.

Niches & benches

Built-in tiled storage and seating that make a shower feel custom.

Floating vanities

Wall-hung vanities and backlit mirrors that open up small rooms.

Large-format tile

Fewer grout lines and a modern look on floors and feature walls.

Aging-in-place

Grab bars, comfort-height toilets and zero-threshold entries.

Questions

Common questions

How long does a bathroom renovation take?

Most full bathroom remodels take 2 to 4 weeks once materials are on site. Powder rooms are often done in about a week.

Do I need a permit for a bathroom renovation?

Replacing fixtures and finishes usually doesn't need a permit, but moving plumbing or adding a new bathroom often does. We'll tell you at the first visit.

Can I keep using my other bathroom?

Yes. We protect the rest of the house, keep dust contained, and keep water on to the rest of the home except for short planned shut-offs.

Ready to price your project?

Free in-home assessment and a written, fixed-price quote. No pressure.