You closed on a new home in Vaughan, Brampton, Bradford, Bolton or Caledon, and the basement is grey concrete and a furnace. You're not alone: most GTA builders hand over the basement unfinished. The good news? Newer basements are the easiest and best-value basements to finish.
Why newer basements are easier
- Tall ceilings. 8 to 9 foot basements clear the code minimum easily, so no costly lowering.
- Rough-ins. Capped drains for a bathroom are often already in the floor.
- Modern waterproofing. Fewer surprises once the walls come off.
- Big windows and side doors. Lookout lots and builder side doors make egress and a separate entrance simpler.
What it costs
About $80 per sq ft for 500 to 800 sq ft including a basic washroom, dropping to about $75 up to 1,200 sq ft. A typical 1,000 sq ft new-home basement is around $75,000 before HST and permit. Full price breakdown.
Finish it for family, or for rent?
Even if it's a playroom today, plan the layout so it can become a legal unit later: bedrooms with egress windows, a spot for a kitchen and a path to the side door. It costs little extra now and saves a rebuild later.
Before we start
- Report any leaks or cracks to your builder before the walls are closed in.
- We take photos of the bare walls for your records.
- We apply for the building permit (about $5,000 on average, not included in the per-foot price).
See new-home basements or get your price.